BBC Radio Guernsey
New Air Conditioning Installation to Service the Broadcasting Studios
A noise mitigation strategy was necessary due to the close proximity of neighbouring properties. Environ T-spec acoustic enclosures were specified in combination with the new air conditioning units to keep operating noise levels to a minimum.
All works were undertaken by Amalgamated Facilities installation team. The enclosures were stacked in two pairs at the rear of the studio.
The installation has proven to be been a great success and the client is extremely satisfied with the end result.